Photo: Cheung Yin / UnsplashModular can save months. Whether it saves money depends on choices you make before the first module is built.
Read the guide
Photo: Jan van der Wolf / PexelsThree ways to move work into a factory, and the trade-offs that come with each one.
Read the guide
Photo: Cemrecan Yurtman / PexelsWhat to ask, what to look at, and what to get in writing before you commit to a plant.
Read the guide
Photo: Pexels contributor / PexelsThe trip from plant to foundation is where a lot of modular schedules slip. Here is how to plan it.
Read the guide
Photo: Burst / PexelsHow factory-built buildings get approved, who inspects what, and why modular is not the same as a manufactured home.
Read the guide
Photo: aboodi vesakaran / PexelsSmall, repeated buildings are a natural fit for factory production. Here is what recent rollouts show.
Read the guide
Photo: Jakub Pabis / PexelsApartments and hotel rooms are the classic modular fit. Here is what makes those projects work and where they go wrong.
Read the guide
Photo: Hasnan Monir / UnsplashSteel vs wood modular: how to choose
4 min readFrame material decides how tall you can build, what code type you fall under, and which plants can bid.
Read the guide
Photo: Brett Sayles / PexelsFrom prefabricated power skids to full modules, offsite methods are common in data centers. The economics are more nuanced than the pitch.
Read the guide
Photo: Mikael Blomkvist / PexelsModular contracts put more risk on the owner in places people don't expect. Use these questions to find the gaps.
Read the guide
Photo: Hassan Bouamoud / PexelsModular changes when the money goes out the door. Here is how that shows up in your loan, and how to plan for it.
Read the guide
The Offsite Brief
One email a week. New guides, vendors added to the directory, plant openings and product releases, each with a link to the source. Free. Unsubscribe any time.