Modular can save months. Whether it saves money depends on choices you make before the first module is built.
Read the guideThree ways to move work into a factory, and the trade-offs that come with each one.
Read the guideWhat to ask, what to look at, and what to get in writing before you commit to a plant.
Read the guideThe trip from plant to foundation is where a lot of modular schedules slip. Here is how to plan it.
Read the guideHow factory-built buildings get approved, who inspects what, and why modular is not the same as a manufactured home.
Read the guideSmall, repeated buildings are a natural fit for factory production. Here is what recent rollouts show.
Read the guideApartments and hotel rooms are the classic modular fit. Here is what makes those projects work and where they go wrong.
Read the guideSteel vs wood modular: how to choose
4 min readFrame material decides how tall you can build, what code type you fall under, and which plants can bid.
Read the guideFrom prefabricated power skids to full modules, offsite methods are common in data centers. The economics are more nuanced than the pitch.
Read the guideModular contracts put more risk on the owner in places people don't expect. Use these questions to find the gaps.
Read the guide
The Offsite Brief
One email a week. New vendors added to the directory, plant openings, and product releases, each with a link to the source. Free.
Signups open at launch.